MAGNET: Difference between revisions

From KIP Wiki
ā§¼kip-jumptonavigationā§½ā§¼kip-jumptosearchā§½
No edit summary
Line 16: Line 16:
== Magnetisation and Demagnetisation Procedure ==
== Magnetisation and Demagnetisation Procedure ==


[[Image:DEMAG_THERM_00.jpg|right|thumb|180px|Thermalisation of the nuclear stage after ramping the magnet (4T).]]
[[Image:DEMAG_THERM_00.jpg|right|thumb|180px|Thermalisation of the nuclear stage after ramping the magnet up to 4T (RUN-67).]]


* After ramping the magnet the first nuclear stage must be precooled again. The temperature dependence varies as T~t<sup>-1/3</sup>.
* After ramping the magnet the first nuclear stage must be precooled again. The temperature dependence varies as T~t<sup>-1/3</sup>.
Line 24: Line 24:


{{clear}}
{{clear}}



== Upper Magnet (UM) ==
== Upper Magnet (UM) ==

Revision as of 13:19, 18 December 2013

Operation and Control

First test with 50Amps (~5.7T) worked!
  • Power Supply : OXFORD IPS 120-10 (Max.12 Amp @10Volt)
    • Software Remote-control: IPS_120-10_v04.vi
    • ! Change of Range when increasing the current at ~4.3A, when decreasing at ~3.4A! Don't get scared by the noise :)
  • Persistent current switch:
    • Upper magnet - BOX VII, X9:1/4 ,RHeater(4K)=135.
    • IHeater=55mA. The TVL-10 is used as current supply.
  • The region of the experimental platform between the first nuclear stage and the dilution refrigerator is compensated to 5mT when both magnets are at their full field.


Magnetisation and Demagnetisation Procedure

Thermalisation of the nuclear stage after ramping the magnet up to 4T (RUN-67).
  • After ramping the magnet the first nuclear stage must be precooled again. The temperature dependence varies as T~t-1/3.
  • The first nuclear stage was demagnetized by reducing the field in steps by a factor of 2 to a final field of few mT.
  • Sweep Rate B>0.5T : R=2T/h.
  • Sweep Rate B<0.5T : decrease by a factor of 2 proportional to the field.

Upper Magnet (UM)

Connection to upper magnet
  • Connection on window side of cryo. Power-cable are marked red (+) and blue (-).
  • Bmax = 8T, diameter 100mm.
  • I/B-Conversion: B(I) = 0.099 T/A * I[A] , ( 80.68 A = 8 T )
  • Sweep Rate: 1 T/h = 10 A/h = 0.167 A/min

Lower Magnet (LM)

Connection to lower magnet.
  • LM NOT YET TESTED SO FAR!
  • Connection on door side of cryo. Power-cable are marked green (+) and white (-).
  • Bmax = 9T, diameter 50mm.
  • I/B-Conversion: B(I) = 0.115 T/A * I[A] , ( 78.4 A = 9 T )
  • Sweep Rate: 1 T/h = 8.7 A/h = 0.145 A/min


Connection

  • To Power supply: M6 (#13 box wrench, #6 Allen key).
  • To Upper Magnet: Connection on window side. Power-cable are marked red (+) and blue (-).
  • To lower magnet: Connection on door side of the cryostat. Power-cable are marked green (+) and white (-)
  • AMP-Plug (connected witch BOX VII): Control of two persistent current switches, read-out of two Pt-100 and of two heaters.
    • The persistent current switches are used to create and maintain the magnetic fields with the current source.
    • With the help of the two attached Pt-100 Thermometers at the bottom and in the middle of the magnet you can monitor the temperature during the precooling precess with liquid nitrogen (LN).
    • Finally you can also use the two heaters consisting of two solder sticks to decrease the waiting time while warming up the cryostat.


AMP PLUG

The magnet is controlled via BOX VII)