Heike R2014-00 R68: Difference between revisions
From KIP Wiki
ā§¼kip-jumptonavigationā§½ā§¼kip-jumptosearchā§½
Line 55: | Line 55: | ||
* 31.01.2014 : THIRD DAY - |
* 31.01.2014 : THIRD DAY - CLOSING DEWAR, MOUNTING MAGNET |
||
** TEST PADDLE EXPERIMENT: working! See resonance at room temperature! |
** TEST PADDLE EXPERIMENT: working! See resonance at room temperature! |
||
* 3.02.2014: FOURTH DAY - PRECOOLING WITH LN |
|||
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX |
|||
** 08:30 : Start cleaning circulation line, start pumping VC for exchange gas |
|||
** 10:15 : Stop pumping circulation line. Start pumping both cold traps. p<sub>VC</sub>~3*10<sup>-3</sup>mbar. Cleaning 1K-pot & Dewar. |
|||
** 10:45 : p<sub>VC</sub>~3*10<sup>-3</sup>mbar. Then fill in exchange gas to 3 mbar. |
|||
** 11:12 : Start filling LN ('''60l can''') |
|||
** 16:30 : T<sub>Si</sub>~209 K, T<sub>Magn,top</sub>~189 K, T<sub>Dewar</sub>~78 K, p<sub>VC</sub>=1.7 mbar |
|||
** Continue filling LN overnight... |
|||
** XX:XX : Exchange gas p<sub>VC</sub>~3mbar. |
|||
* 4.02.2014: FIFTH DAY - FILLING LH |
|||
** XX:XX : Pre-cooling with 60l LN. |
|||
** 08:20 : T<sub>Si</sub>~130 K, T<sub>Magn,top</sub>~131 K, T<sub>Dewar</sub>~131 K, p<sub>VC</sub>=1.1 mbar. Start pumping nitrogen and clean with helium gas. Do not forget to clean 1K pot! |
|||
** 09:40 : 1<sup>st</sup> He can --> ~68l |
|||
** 11:45 : 2<sup>nd</sup> He can --> ~95.2l. T<sub>Si</sub>~80 K, T<sub>Magn,top</sub>~50 K, T<sub>Dewar</sub>~10 K, p<sub>VC</sub>=4.5*10<sup>-1</sup>mbar. |
|||
** 12:35 : T<sub>Dewar</sub>~4 K, T<sub>Si</sub>~63 K. Switch off <span style="color:#0f0">1K-Pot</span> pump and close 1K2, 1K3 |
|||
Revision as of 09:12, 5 February 2014
First RUN since more than one year!!!
NEW
- New Switch & Relay Box for a easier and better operation of the persistent current switches of the current lines and both magnets.
- HF coax wiring for the Paddle experiment: Two Semi rigid coax cables(Type: SC-160/50-NbTi-NbTi) connecting the experiment mounted underneath the Cu-Stage with the heat sinks at the mixing chamber (Coax #5 & #6). With the help of an "extender", made of a long silver rod, the experiment is placed in the centre of the lower magnet and can be exposed to a magnetic field up to 9T.
- HF coax wiring for the Echo experiment leading from the heat sink at 4K (Coax #2 & #4) to a heat sink at the mixing chamber. The Echo Experiment is mounted on the top side of the Cu-Stage and connected with superconducting semi rigid coax cables (Type: SC-160/50-NbTi-NbTi) with this heat sink.
EXPERIMENTS
- Thermometry: Noise Thermometer and Pt-NMR Thermometer
- Paddle Experiment: Zr55Cu30Al10Ni5 (M. Hempel)
- Echo Experiment: BK-7 (M. Wolter)
TEST
TIME TABLE
- 28.01.2014: FIRST DAY - CLOSING
- Closing cryostat.
- 15:30 : Start pumping VC with VP.
- 17:40 : Stop pumping VC, VP off: pVC~0.3mbar. Close valves, stop pump.
- 29.01.2014 : SECOND DAY - CLEANING & LEAK TEST
- 08:30 : pVC~3.2mbar.
- 09:45 : Start pumping VC again for leak testing.
- 10:30 : Cleaning cooling water circulation since it's blocked again ... :( (see photos on the right!)
- 14:50 : Leak Test: QL<10-10mbar*l/sec (with DP running)
- 15:00 : Cleaning/pumping lines.
- 16:00 : Start pumping VC with DP
- 19:00 : Stop pumping VC, DP off: 2*10-3mbar
- 31.01.2014 : THIRD DAY - CLOSING DEWAR, MOUNTING MAGNET
- TEST PADDLE EXPERIMENT: working! See resonance at room temperature!
- 3.02.2014: FOURTH DAY - PRECOOLING WITH LN
- 08:30 : Start cleaning circulation line, start pumping VC for exchange gas
- 10:15 : Stop pumping circulation line. Start pumping both cold traps. pVC~3*10-3mbar. Cleaning 1K-pot & Dewar.
- 10:45 : pVC~3*10-3mbar. Then fill in exchange gas to 3 mbar.
- 11:12 : Start filling LN (60l can)
- 16:30 : TSi~209 K, TMagn,top~189 K, TDewar~78 K, pVC=1.7 mbar
- Continue filling LN overnight...
- 4.02.2014: FIFTH DAY - FILLING LH
- 08:20 : TSi~130 K, TMagn,top~131 K, TDewar~131 K, pVC=1.1 mbar. Start pumping nitrogen and clean with helium gas. Do not forget to clean 1K pot!
- 09:40 : 1st He can --> ~68l
- 11:45 : 2nd He can --> ~95.2l. TSi~80 K, TMagn,top~50 K, TDewar~10 K, pVC=4.5*10-1mbar.
- 12:35 : TDewar~4 K, TSi~63 K. Switch off 1K-Pot pump and close 1K2, 1K3
- XX:XX : Status = TDewar=??K, TMagn,l=???K, pVC=??mbar
- XX:XX : Start filling LHe
- XX:XX : During 3rd can (after ~ 230 LHe in total): TRuOx=4.6K, pVC=3.3*10-3mbar
- XX:XX : Pump VC
- XX:XX : He 100%, LHe in total ~????l
- XX:XX : Stop pumping VC, pVC=??*10-5mbar
- XX.XX.2014: THIRD DAY - MIX IN
- XX:XX : Status = pVC=??*10-5mbar, TMC,RuOx=???, TMC.Si=??K
- XX:XX : Start condensing mix. T1=683mbar, T2=695mbar, T3=0mbar, p4=973mbar.
- XX:XX : Close Heat-Switch (IPCS#4=1.5A, IH=0.5mA) @ TRuOx=600mK
- XX:XX : IStill=3.0mA, TRuOx=580mK
- XX:XX : All mix is in, all pumps are running.
- XX.XX.XX: - RAMP MAGNET
- XX.XX.XX: - DEMAG
- XX.XX.XX: MIX OUT
- XX:XX : Start filling mix into the tanks.