Heike R2012-02 R66: Difference between revisions

From KIP Wiki
ā§¼kip-jumptonavigationā§½ā§¼kip-jumptosearchā§½
Line 6: Line 6:


=Time Table=
=Time Table=
[[Image:Icy_transfer-tube.jpg|right|thumb|200px|Transfer tube with a sub-prime vacuum :)]]
[[Image:Icy_transfer-tube.jpg|right|thumb|200px|Icy transfer tube with a sub-prime vacuum :)]]


* 28.02.2012: FIRST DAY - CLOSING, CLEANING & PRECOOLING
* 28.02.2012: FIRST DAY - CLOSING, CLEANING & PRECOOLING

Revision as of 08:39, 1 March 2012

NEW

  • Pt-NMR read-out via two s.s. mini-coax. Signal Coil is connected with port #1 and #3.

Time Table

Icy transfer tube with a sub-prime vacuum :)
  • 28.02.2012: FIRST DAY - CLOSING, CLEANING & PRECOOLING
    • Closing cyrostat and dewar. Cleaning/pumping lines.
    • Precooling with 50l LN.


  • 29.02.2012: SECOND DAY - LIQUID HELIUM
    • 07:50 : Status = TDewar=207K, TMC,Si=216K, TMagn,l=217K, pVC=2.15mbar
    • 09:55 : Start filling LHe
    • 17:00 : Status after two cans (188.8l LHe) =TMC,Si=80K, TMagn,u=50K, pVC=0.45mbar


  • 01.03.2012: THIRD DAY
    • 08:00 : Status = TDewar=78K, TMC,Si=80K, TMagn,u=81K, pVC=0.67mbar, connect 3rd can LHe