Heike R2010-11 R65: Difference between revisions

From KIP Wiki
ā§¼kip-jumptonavigationā§½ā§¼kip-jumptosearchā§½
Line 17: Line 17:


= Summary =
= Summary =
* 30.11.11: COOLING DOWN
* 30.11.11: CLOSING AND PRECOOLING
** 10:30 : Start closing Cryo
** 10:30 : Start closing Cryo
** 14:00 : Dewar closed , start pumping dewar. All lines pumped, all pumps tested.
** 14:00 : Dewar closed , start pumping dewar. All lines pumped, all pumps tested.

Revision as of 16:27, 1 December 2011

NEW

  • Squid-Wiring for one two-stage Squid
  • Two Lemo plugs and four coax-feedthroughs on top of cryostat.
  • RuOx-000 Thermometer on lower MC platform.
  • New Still-heater!! old one was broken? New resitance RSTILL=1.13k.
  • New Noise-Thermometer mounted on Demag-Stage read out by two Squids.


Tests


Summary

  • 30.11.11: CLOSING AND PRECOOLING
    • 10:30 : Start closing Cryo
    • 14:00 : Dewar closed , start pumping dewar. All lines pumped, all pumps tested.
    • Exchange gas: pVC=10mbar.
    • 15:00 : Start filling nitrogen
    • 17:12 : Dewar Pt-100 shows LN. Continue filling.
    • 17:45 : LN vessel remains connected with the cryostat during the night but without any pressure, atmosphere-valve of LN can is open! (TDewar=78K, TMC,Si-Diode=253K, pVC=3.89mbar, TMagn,u.=233)
  • 01.12.11: START COOLING WITH LHe
    • 08:00 : Status: TDewar=225K, TMC,Si-Diode=221K, pVC=3.4mbar, TMagn,u.=230K. Continue filling with LN until TDewar=78K, continue for 5 minutes.
    • 10:45 : Pump dewar (-0.8bar), float with He from recovery line
    • 11:00 : 1st can of LHe connected, start 1K-pump (TDewar=121K, TMC,Si-Diode=206K, pVC=3mbar, TMagn,u.=176K)


Checking Filterboxes

  • done!
  • details will be added :)