Line 14: Line 14:
= EXPERIMENTS =
= EXPERIMENTS =


* Thermometry: Noise Thermometer and Pt-NMR Thermometer
* '''Thermometry:''' Noise Thermometer and Pt-NMR Thermometer
* Paddle Experiment: Zr<sub>55</sub>Cu<sub>30</sub>Al<sub>10</sub>Ni<sub>5</sub> (M. Hempel)
* '''Paddle Experiment:''' Zr<sub>55</sub>Cu<sub>30</sub>Al<sub>10</sub>Ni<sub>5</sub> (M. Hempel)
* Echo Experiment: BK-7 (M. Wolter)
* '''Echo Experiment:''' BK-7 (M. Wolter)





Revision as of 08:03, 29 January 2014

First RUN since more than one year!!!

NEW

  • New Switch & Relay Box for a easier and better operation of the persistent current switches of the current lines and both magnets.
  • HF coax wiring for the Paddle experiment: Two Semi rigid coax cables(Type: SC-160/50-NbTi-NbTi) connecting the experiment mounted underneath the Cu-Stage with the heat sinks at the mixing chamber (Coax #5 & #6). With the help of an "extender", made of a long silver rod, the experiment is placed in the centre of the lower magnet and can be exposed to a magnetic field up to 9T.
  • HF coax wiring for the Echo experiment leading from the heat sink at 4K to a heat sink at the mixing chamber. The Echo Experiment is mounted on the top side of the Cu-Stage and connected with superconducting semi rigid coax cables (Type: SC-160/50-NbTi-NbTi) with this heat sink.


EXPERIMENTS

  • Thermometry: Noise Thermometer and Pt-NMR Thermometer
  • Paddle Experiment: Zr55Cu30Al10Ni5 (M. Hempel)
  • Echo Experiment: BK-7 (M. Wolter)


TEST


TIME TABLE

  • XX.XX.2014: FIRST DAY - CLOSING, CLEANING & PRE-COOLING
    • Closing cryostat and dewar. Cleaning/pumping lines.
    • Exchange gas pVC~3mbar.
    • : Pre-cooling with 50l LN.


  • XX.XX.2014 : SECOND DAY - LIQUID HELIUM
    • XX:XX : Status = TDewar=??K, TMagn,l=???K, pVC=??mbar
    • XX:XX : Start filling LHe
    • XX:XX : During 3rd can (after ~ 230 LHe in total): TRuOx=4.6K, pVC=3.3*10-3mbar
    • XX:XX : Pump VC
    • XX:XX : He 100%, LHe in total ~????l
    • XX:XX : Stop pumping VC, pVC=??*10-5mbar


  • XX.XX.2014: THIRD DAY - MIX IN
    • XX:XX : Status = pVC=??*10-5mbar, TMC,RuOx=???, TMC.Si=??K
    • XX:XX : Start condensing mix. T1=683mbar, T2=695mbar, T3=0mbar, p4=973mbar.
    • XX:XX : Close Heat-Switch (IPCS#4=1.5A, IH=0.5mA) @ TRuOx=600mK
    • XX:XX : IStill=3.0mA, TRuOx=580mK
    • XX:XX : All mix is in, all pumps are running.


  • XX.XX.XX: - RAMP MAGNET


  • XX.XX.XX: - DEMAG



  • XX.XX.XX: MIX OUT
    • XX:XX : Start filling mix into the tanks.

TO DO