Heike R2012-02 R66: Difference between revisions

From KIP Wiki
ā§¼kip-jumptonavigationā§½ā§¼kip-jumptosearchā§½
Line 10: Line 10:
** Closing cyrostat and dewar. Cleaning/pumping lines.
** Closing cyrostat and dewar. Cleaning/pumping lines.
** Precooling with 50l LN.
** Precooling with 50l LN.

{{clear}}
{{clear}}
* '''29.02.2012: SECOND DAY - LIQUID HELIUM'''
* '''29.02.2012: SECOND DAY - LIQUID HELIUM'''
** 07:50 : Status = T<sub>Dewar</sub>=207K, T<sub>MC,Si</sub>=216K, T<sub>Magn,l</sub>=217K, p<sub>VC</sub>=2.15mbar
** 07:50 : Status = T<sub>Dewar</sub>=207K, T<sub>MC,Si</sub>=216K, T<sub>Magn,l</sub>=217K, p<sub>VC</sub>=2.15mbar
** 09:55 : Start filling LHe
** 09:55 : Start filling LHe
** 17:00 : Status after two cans (188.8l LHe) =T<sub>MC,Si</sub>=80K, T<sub>Magn,u</sub>=50K, p<sub>VC</sub>=0.45mbar
** 17:00 : Status after two cans ('''188.8l LHe''') =T<sub>MC,Si</sub>=80K, T<sub>Magn,u</sub>=50K, p<sub>VC</sub>=0.45mbar

{{clear}}
{{clear}}
* '''01.03.2012: THIRD DAY'''
* '''01.03.2012: THIRD DAY'''

Revision as of 08:27, 1 March 2012

NEW

  • Pt-NMR read-out via two s.s. mini-coax.

Time Table

  • 28.02.2012: FIRST DAY - CLOSING, CLEANING & PRECOOLING
    • Closing cyrostat and dewar. Cleaning/pumping lines.
    • Precooling with 50l LN.
  • 29.02.2012: SECOND DAY - LIQUID HELIUM
    • 07:50 : Status = TDewar=207K, TMC,Si=216K, TMagn,l=217K, pVC=2.15mbar
    • 09:55 : Start filling LHe
    • 17:00 : Status after two cans (188.8l LHe) =TMC,Si=80K, TMagn,u=50K, pVC=0.45mbar
  • 01.03.2012: THIRD DAY
    • 08:00 : Status = TDewar=78K, TMC,Si=80K, TMagn,u=81K, pVC=0.67mbar, connect 3rd can LHe