Heike R2010-11 R65: Difference between revisions
From KIP Wiki
ā§¼kip-jumptonavigationā§½ā§¼kip-jumptosearchā§½
Line 9: | Line 9: | ||
= Summary = |
= Summary = |
||
* 30.11.11: Start closing Cryo (10:30)- |
* 30.11.11: Start closing Cryo (10:30)- |
||
* 30.11.11: |
* 30.11.11: Dewar closed (15:00), start pumping dewar. All lines pumped, all pumps tested. |
||
All lines pumped, all pumps tested. |
|||
{{clear}} |
{{clear}} |
Revision as of 14:31, 30 November 2011
NEW
- RuOx-000 Thermometer on lower MC platform.
- New Still-heater!! old one was broken? New resitance RSTILL=1.13k.
Summary
- 30.11.11: Start closing Cryo (10:30)-
- 30.11.11: Dewar closed (15:00), start pumping dewar. All lines pumped, all pumps tested.
Tests
Checking Filterboxes
- done!
- details will be added :)