Heike R2014-00 R68: Difference between revisions
From KIP Wiki
ā§¼kip-jumptonavigationā§½ā§¼kip-jumptosearchā§½
(Created page with "First RUN since more than one year") Ā |
Ā |
||
(24 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
First RUN since more than one year |
First RUN since more than one year!!! |
||
= NEW = |
|||
* New '''Switch & Relay Box''' for a easier and better operation of the persistent current switches of the current lines and both magnets. |
|||
* HF coax wiring for the '''Paddle experiment''': Two Semi rigid coax cables(Type: SC-160/50-NbTi-NbTi) connecting the experiment mounted underneath the Cu-Stage with the heat sinks at the mixing chamber (Coax #5 & #6). With the help of an "extender", made of a long silver rod, the experiment is placed in the centre of the lower magnet and can be exposed to a magnetic field up to 9T. |
|||
* HF coax wiring for the '''Echo experiment''' leading from the heat sink at 4K (Coax #2 & #4) to a heat sink at the mixing chamber. The Echo Experiment is mounted on the top side of the Cu-Stage and connected with superconducting semi rigid coax cables (Type: SC-160/50-NbTi-NbTi) with this heat sink. |
|||
{{clear}} |
|||
= EXPERIMENTS = |
|||
* '''Thermometry:''' Noise Thermometer and Pt-NMR Thermometer |
|||
* '''Paddle Experiment:''' Zr<sub>55</sub>Cu<sub>30</sub>Al<sub>10</sub>Ni<sub>5</sub> (M. Hempel) |
|||
* '''Echo Experiment:''' BK-7 (M. Wolter) |
|||
{{clear}} |
|||
=TEST= |
|||
* |
|||
* |
|||
* |
|||
{{clear}} |
|||
=TIME TABLE= |
|||
[[Image:W3e.jpg|right|thumb|150px|Bottles of Antikal.]] |
|||
[[Image:Dirt_00.jpg|right|thumb|150px|Bigger than 5Āµ!.]] |
|||
[[Image:Dirt_01.jpg|right|thumb|150px|Cheers!.]] |
|||
* 28.01.2014: FIRST DAY - CLOSING |
|||
** Closing cryostat. |
|||
** 15:30 : Start pumping VC with VP. |
|||
** 17:40 : Stop pumping VC, VP off: p<sub>VC</sub>~0.3mbar. Close valves, stop pump. |
|||
* 29.01.2014 : SECOND DAY - CLEANING & LEAK TEST |
|||
** 08:30 : p<sub>VC</sub>~3.2mbar. |
|||
** 09:45 : Start pumping VC again for leak testing. |
|||
** 10:30 : Cleaning cooling water circulation since it's blocked again ... :( (see photos on the right!) |
|||
** 14:50 : Leak Test: Q<sub>L</sub><10<sup>-10</sup>mbar*l/sec (with DP running) |
|||
** 15:00 : Cleaning/pumping lines. |
|||
** 16:00 : Start pumping VC with DP |
|||
** 19:00 : Stop pumping VC, DP off: 2*10<sup>-3</sup>mbar |
|||
* 31.01.2014 : THIRD DAY - CLOSING DEWAR, MOUNTING MAGNET |
|||
** TEST PADDLE EXPERIMENT: working! See resonance at room temperature! |
|||
* 3.02.2014: FOURTH DAY - PRECOOLING WITH LN |
|||
** 08:30 : Start cleaning circulation line, start pumping VC for exchange gas |
|||
** 10:15 : Stop pumping circulation line. Start pumping both cold traps. p<sub>VC</sub>~3*10<sup>-3</sup>mbar. Cleaning 1K-pot & Dewar. |
|||
** 10:45 : p<sub>VC</sub>~3*10<sup>-3</sup>mbar. Then fill in exchange gas to 3 mbar. |
|||
** 11:12 : Start filling LN ('''60l can''') |
|||
** 16:30 : T<sub>Si</sub>~209 K, T<sub>Magn,top</sub>~189 K, T<sub>Dewar</sub>~78 K, p<sub>VC</sub>=1.7 mbar |
|||
** Continue filling LN overnight... |
|||
* 4.02.2014: FIFTH DAY - FILLING LH |
|||
** 08:20 : T<sub>Si</sub>~130 K, T<sub>Magn,top</sub>~131 K, T<sub>Dewar</sub>~131 K, p<sub>VC</sub>=1.1 mbar. Start pumping nitrogen and clean with helium gas. Do not forget to clean 1K pot! |
|||
** 09:40 : 1<sup>st</sup> He can --> ~68l |
|||
** 11:45 : 2<sup>nd</sup> He can --> ~95.2l. T<sub>Si</sub>~80 K, T<sub>Magn,top</sub>~50 K, T<sub>Dewar</sub>~10 K, p<sub>VC</sub>=4.5*10<sup>-1</sup>mbar. |
|||
** 12:35 : T<sub>Dewar</sub>~4 K, T<sub>Si</sub>~63 K. Switch off 1K-Pot pump and close 1K2, 1K3. |
|||
** 13:40 : T<sub>Si</sub>~4 K. Pump VC (14:00) |
|||
** 14:37 : 3<sup>rd</sup> He can --> ~88l. |
|||
** 16:10 : 4<sup>th</sup> He can --> ~46l. |
|||
'''Total helium consumption: ~297.2l''' |
|||
* 5.02.2014: SIXTH DAY - TESTING MAGNET |
|||
** 08:00 : T<sub>Si</sub>~4.85 K, p<sub>VC</sub>=1*10<sup>-5</sup>mbar. He level ~48% |
|||
** 08:18 : Close VC1, switch off DP. |
|||
** 08:50 : Close VC3 & VC4, switch off FP2. |
|||
* XX.XX.2014: THIRD DAY - '''MIX IN''' |
|||
** XX:XX : Status = p<sub>VC</sub>=??*10<sup>-5</sup>mbar, T<sub>MC,RuOx</sub>=???, T<sub>MC.Si</sub>=??K |
|||
** XX:XX : Start condensing mix. '''T<sub>1</sub>=683mbar, T<sub>2</sub>=695mbar, T<sub>3</sub>=0mbar, p<sub>4</sub>=973mbar'''. |
|||
** XX:XX : Close Heat-Switch (I<sub>PCS#4</sub>=1.5A, I<sub>H</sub>=0.5mA) @ T<sub>RuOx</sub>=600mK |
|||
** XX:XX : I<sub>Still</sub>=3.0mA, T<sub>RuOx</sub>=580mK |
|||
** XX:XX : All mix is in, all pumps are running. |
|||
* XX.XX.XX: - '''RAMP MAGNET''' |
|||
** |
|||
* XX.XX.XX: - '''DEMAG ''' |
|||
** |
|||
* XX.XX.XX: '''MIX OUT''' |
|||
** XX:XX : Start filling mix into the tanks. |
|||
{{clear}} |
|||
=TO DO= |
|||
* |
|||
* |
|||
* |
|||
{{clear}} |
Latest revision as of 09:21, 5 February 2014
First RUN since more than one year!!!
NEW
- New Switch & Relay Box for a easier and better operation of the persistent current switches of the current lines and both magnets.
- HF coax wiring for the Paddle experiment: Two Semi rigid coax cables(Type: SC-160/50-NbTi-NbTi) connecting the experiment mounted underneath the Cu-Stage with the heat sinks at the mixing chamber (Coax #5 & #6). With the help of an "extender", made of a long silver rod, the experiment is placed in the centre of the lower magnet and can be exposed to a magnetic field up to 9T.
- HF coax wiring for the Echo experiment leading from the heat sink at 4K (Coax #2 & #4) to a heat sink at the mixing chamber. The Echo Experiment is mounted on the top side of the Cu-Stage and connected with superconducting semi rigid coax cables (Type: SC-160/50-NbTi-NbTi) with this heat sink.
EXPERIMENTS
- Thermometry: Noise Thermometer and Pt-NMR Thermometer
- Paddle Experiment: Zr55Cu30Al10Ni5 (M. Hempel)
- Echo Experiment: BK-7 (M. Wolter)
TEST
TIME TABLE
- 28.01.2014: FIRST DAY - CLOSING
- Closing cryostat.
- 15:30 : Start pumping VC with VP.
- 17:40 : Stop pumping VC, VP off: pVC~0.3mbar. Close valves, stop pump.
- 29.01.2014 : SECOND DAY - CLEANING & LEAK TEST
- 08:30 : pVC~3.2mbar.
- 09:45 : Start pumping VC again for leak testing.
- 10:30 : Cleaning cooling water circulation since it's blocked again ... :( (see photos on the right!)
- 14:50 : Leak Test: QL<10-10mbar*l/sec (with DP running)
- 15:00 : Cleaning/pumping lines.
- 16:00 : Start pumping VC with DP
- 19:00 : Stop pumping VC, DP off: 2*10-3mbar
- 31.01.2014 : THIRD DAY - CLOSING DEWAR, MOUNTING MAGNET
- TEST PADDLE EXPERIMENT: working! See resonance at room temperature!
- 3.02.2014: FOURTH DAY - PRECOOLING WITH LN
- 08:30 : Start cleaning circulation line, start pumping VC for exchange gas
- 10:15 : Stop pumping circulation line. Start pumping both cold traps. pVC~3*10-3mbar. Cleaning 1K-pot & Dewar.
- 10:45 : pVC~3*10-3mbar. Then fill in exchange gas to 3 mbar.
- 11:12 : Start filling LN (60l can)
- 16:30 : TSi~209 K, TMagn,top~189 K, TDewar~78 K, pVC=1.7 mbar
- Continue filling LN overnight...
- 4.02.2014: FIFTH DAY - FILLING LH
- 08:20 : TSi~130 K, TMagn,top~131 K, TDewar~131 K, pVC=1.1 mbar. Start pumping nitrogen and clean with helium gas. Do not forget to clean 1K pot!
- 09:40 : 1st He can --> ~68l
- 11:45 : 2nd He can --> ~95.2l. TSi~80 K, TMagn,top~50 K, TDewar~10 K, pVC=4.5*10-1mbar.
- 12:35 : TDewar~4 K, TSi~63 K. Switch off 1K-Pot pump and close 1K2, 1K3.
- 13:40 : TSi~4 K. Pump VC (14:00)
- 14:37 : 3rd He can --> ~88l.
- 16:10 : 4th He can --> ~46l.
Total helium consumption: ~297.2l
- 5.02.2014: SIXTH DAY - TESTING MAGNET
- 08:00 : TSi~4.85 K, pVC=1*10-5mbar. He level ~48%
- 08:18 : Close VC1, switch off DP.
- 08:50 : Close VC3 & VC4, switch off FP2.
- XX.XX.2014: THIRD DAY - MIX IN
- XX:XX : Status = pVC=??*10-5mbar, TMC,RuOx=???, TMC.Si=??K
- XX:XX : Start condensing mix. T1=683mbar, T2=695mbar, T3=0mbar, p4=973mbar.
- XX:XX : Close Heat-Switch (IPCS#4=1.5A, IH=0.5mA) @ TRuOx=600mK
- XX:XX : IStill=3.0mA, TRuOx=580mK
- XX:XX : All mix is in, all pumps are running.
- XX.XX.XX: - RAMP MAGNET
- XX.XX.XX: - DEMAG
- XX.XX.XX: MIX OUT
- XX:XX : Start filling mix into the tanks.