== Summary ==
* 11.29.10 : Cryo closed
* 11.30.10 : Start filling LN (13:30)
* 12.01.10 : Start filling LHe (12:40), Start conditions: T<sub>Si</sub>=166K, T<sub>Mag,TOP</sub>=155K, T<sub>Dewar</sub>=110K.
* 12.01.10 : After 400l of LHe (11:40) dewar is filled and T<sub>Si</sub>=4.2K.
* 12.17.10 : MIX OUT
* 03.03.11 : Open Dewar and Cryo
{{clear}}

== Tests ==
We did a lot of test with our new build in devices and connected heat-switches.
* Thermometry:
** Test Si-Diode (Model: DT-470-CU): Works great down to approximately 1.1K There is only a small deviation of 0.1K at 4.2K. So we should do some small corrections of the calibration curve.
** Test PdFe- Susceptibility Thermometer: Doesn't work!
** Test ET- Susceptibility Thermometer: Works! :)
** Test Pt-NMR: Works so far. Frozen in a persistent current of 1.5A, but we weren't able to read out the NMR quit well since we didn't know whether the Cu-stage was cold or not.
** FPD: Read-out doesn't work with the digital Lock-In amplifier ITHACO 3961B due to its too high noise on the analog signal output. Therefore we changed to a analog Lock-In amplifier (ITHACO 393). With this device we are now able to detect all five T<sub>C</sub>'s.

* Persistent Current Switch:
** Test PCS of Pt-NMR: Works! (1.5Amp)
** Test Heat-Switch of Cu-Stage: Doesn't work! :( Seems like the superconducting wire has a small ohmic resistance of a few m{{O}}. This leads to small heating of some mW and causes the shunting via the 4K-flange!


== TO DO ==
* Get rid of ground loops.
* Fixing the superconducting PCS of the thermal link connecting the Cu-stage.
* Suppress magnetic noise
* Remove filters in NMR-line.
* ...

Latest revision as of 10:41, 3 March 2011

RUN 64: NOVEMBER 2010

First Run with Cu-Stage!

Summary

  • 11.29.10 : Cryo closed
  • 11.30.10 : Start filling LN (13:30)
  • 12.01.10 : Start filling LHe (12:40), Start conditions: TSi=166K, TMag,TOP=155K, TDewar=110K.
  • 12.01.10 : After 400l of LHe (11:40) dewar is filled and TSi=4.2K.
  • 12.17.10 : MIX OUT
  • 03.03.11 : Open Dewar and Cryo

Tests

We did a lot of test with our new build in devices and connected heat-switches.

  • Thermometry:
    • Test Si-Diode (Model: DT-470-CU): Works great down to approximately 1.1K There is only a small deviation of 0.1K at 4.2K. So we should do some small corrections of the calibration curve.
    • Test PdFe- Susceptibility Thermometer: Doesn't work!
    • Test ET- Susceptibility Thermometer: Works! :)
    • Test Pt-NMR: Works so far. Frozen in a persistent current of 1.5A, but we weren't able to read out the NMR quit well since we didn't know whether the Cu-stage was cold or not.
    • FPD: Read-out doesn't work with the digital Lock-In amplifier ITHACO 3961B due to its too high noise on the analog signal output. Therefore we changed to a analog Lock-In amplifier (ITHACO 393). With this device we are now able to detect all five TC's.
  • Persistent Current Switch:
    • Test PCS of Pt-NMR: Works! (1.5Amp)
    • Test Heat-Switch of Cu-Stage: Doesn't work! :( Seems like the superconducting wire has a small ohmic resistance of a few m. This leads to small heating of some mW and causes the shunting via the 4K-flange!


TO DO

  • Get rid of ground loops.
  • Fixing the superconducting PCS of the thermal link connecting the Cu-stage.
  • Suppress magnetic noise
  • Remove filters in NMR-line.
  • ...